The main timber structure of the building is a recycled road bridge from Queensland. The trusses were prefabricated on the ground before hoisting aloft. A neighbour cut all the 50mm Australian hardwood slabs lining the walls. The flooring is Kauri timber from an old floor in Western Australia. The kitchen was totally encased in hebel blocks to block access to vermin and provide additional insulation.  HOME